Engr. Kamal
Bechelor of Technology
REC/NIT Hamirpur (H.P.),
India, [1998 - 2002].
Client : KNPC
Project Description:
C4i (Command, Control, Communication, Computers and Intelligence) project with KNPC (Kuwait National Petroleum Company) at Al Ahmadi in a classified area; which is a project of National strategically Importance and shall act as a command and control center for KNPC Operations and is very vital in a security perspective.
The building is protected by a combined wet sprinkler and standpipe system. In addition, clean agent automatic flooded type fire suppression system is used for server rooms, electrical rooms, communication rooms, etc. Portable fire extinguishers are distributed in corridors and designated areas.
Role:
o
Study of project specifications and drawings
o
Quantity take-off and prepare BoQ.
o
Prepare price and technical comparison sheet
o
Prepare material submittals for approvals
o
Prepare technical queries for shop drawings clarifications
o
Prepare builder works (MEP Openings) drawings
o
Create shop drawings for plumbing and fire protection.
o
Supervise mechanical work on the site
o
Created for operation and maintenance manual
o
Created As-Built drawings and other close out documents.
C4i Building at Al-Ahmadi, Kuwait
Fawsec Campus Residential and Commercial Building, Sabah Salem, Kuwait
Client :Fawsec Educational Society
Project Description:
Fawsec is a non-profit organization with the offices in Kuwait and USA, created to develop and manage many educational and health care institutions and their properties.
Fawsec campus, located in Sabah Al Salem Area of Kuwait City, has been designed as a group of interconnected midrise buildings, providing residential units (190 one-bedroom apartments), leisure and activity units. The total built up area is approximately 19,000 sqm and the buildings are finished to the highest standards.
Project Value: 30 Million US$.
This 18 story building is protected by a combined wet sprinkler and standpipe system. Fire Hose Cabinet (FHC) including Landing Valve (LV) are installed in each floors of four tower building. Pillar Hydrants are installed on Ground Floor. Generator room is protected by Foam System.
Role:
o
Study of project specifications and drawings
o
Quantity take-off and prepare BoQ.
o
Prepare price and technical comparison sheet
o
Perform Hydraulic Calculations for Sprinkler System.
o
Perform drainage load calculation to very pipe sizes.
o
Prepare material submittals for approvals
o
Prepare technical queries for shop drawings clarifications
o
Prepare builder works (MEP Openings) drawings
o
Create shop drawings for plumbing and fire protection
o
Create MEP Composite drawings for site coordination.
o
Supervise mechanical work on the site.
o
Submit checklist for consultant approval.
New Industrial Building (Workshop cum Office), Al-Ahmadi, Kuwait
Client : Gulf Engineering Company.
This is a three story office building with one basement as workshop.
The building is protected by a combined wet sprinkler in basement and Fire Hose Cabinet (FHC) on upper floor. Fire Extinguishers are distributed all over the building.
o
Design of Plumbing and Fire Fighting System
o
Prepare Fire Fighting drawings and material for KFD approval
o
Create shop drawings for plumbing and fire protection
o
Prepare builder works (MEP Openings) drawings
o
Supervise mechanical work on the site.
o
Material take-off and prepare schedule of requirements
o Testing and commissioning and final KFD approval.
Egailla NHC, Egailla, Kuwait
It consists of Supermarket & Shops, Social Development Center, Banks, Library, Mosque, Clinic and some Governmental Offices.
Each buildings are protected by a combined wet sprinkler and standpipe system. In addition, clean agent automatic flooded type fire suppression system is used for HT and LT rooms. Generator room is protected by Foam System. Pillar hydrants are distributed all over.
Client : Ministry of Public Works
o
Supervise mechanical work on the site.
o
Create As-built drawings for plumbing and fire protection.
o
Create for operation and maintenance manual plumbing and fire protection
o Testing, commissioning and handing over to client.
|